The 25th Attack Group is modernizing its training capabilities with a simulation platform that replicates combat scenarios in a virtual airspace called Distributed Mission Operations. The DMO network enables the 25th ATKG and its geographically separated units to operate in the same virtual
In a momentous shift that enhances the identity, capabilities, and mission support of base services, the 432nd Force Support Squadron has officially transitioned from a unit to a full-fledged squadron. This transition places the squadron directly under the Mission Support Group. The activation
The 432nd Wing/432nd Air Expeditionary Wing has seen a lot of changes throughout its history since it first activated in 1943 as the 432nd Observation Group. It has seen the deactivation, reactivation and creation of entire squadrons throughout the decades. On April 23, 2025, the 432nd Communication
Members assigned to the 482nd Attack Squadron render a first salute to the incoming squadron commander during the 482nd ATKS change of command ceremony at Shaw Air Force Base, S.C., Mar. 28, 2025. Lt. Col. Christopher Lyells is the fifth commander for the 482nd ATKS, which provides 24/7/365 MQ-9
To showcase these adaptive advancements, the 25th Attack Group conducted a two-day, total-force integrated “Software Roadshow” at Shaw Air Force Base, S.C., Feb. 7, 2025, showcasing new software updates improving the automated takeoff and landing capabilities of the MQ-9 Reaper.
Davis-Monthan Fire Department Wins DoD Award
SecAF highlights FY26 priorities, strategic challenges in SASC testimony
71st RQS collaborates with 908th AES for simulated patient evacuation
101 Critical Days of Summer – Fun in the sun!
Ninja Nation Reboots the Wing
US Air Force B-52s arrive at Morón for Bomber Task Force Europe deployment
DOD Announces USAF, USSF Winners of the 2025 Commander in Chief's Annual Award for Installation Excellence
Air Force seeks partner for commercialized on-base lodging
Drinking Water Quality 2023
Restoration Advisory Board
Draft Environmental Assessment for Installation Development Plan